Title: Approval of a design contract with Urban Civil for the Oak Run Sidewalk Project, utilizing a portion of the remaining funds from the tax note issued for the 2019 Bond Preliminary Engineering Reports/Design.
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Presenter/Contact

Presenter

Jennifer Cain, Capital Programs Manager

Contact Info

(830) 221-4646 - jcain@nbtexas.org

 

Subject Header

SUBJECT:

Title

Approval of a design contract with Urban Civil for the Oak Run Sidewalk Project, utilizing a portion of the remaining funds from the tax note issued for the 2019 Bond Preliminary Engineering Reports/Design.

 

Body

BACKGROUND / RATIONALE:

The proposed 2019 Bond Citywide Street and Sidewalks Program could include: Asphalt excavation and replacement, base repairs, curb repair/replacement, sidewalk repairs/replacement, mill and overlay, and concrete diamonds around meter boxes and manholes.

 

On September 10, 2018, City Council voted to include the Oak Run Sidewalk project in year one as part of the proposed 2019 Bond Citywide Streets and Sidewalks Program.

 

Urban Civil provided a proposal in the amount of $58,365 for design engineering and surveying services.

 

 

ADDRESSES A NEED/ISSUE IN A CITY PLAN OR COUNCIL PRIORITY:

X

Yes

City of New Braunfels Strategic Priorities

Infrastructure-Continue an ongoing program of infrastructure construction and maintenance.

 

 

FISCAL IMPACT:

Utilization of the remaining funds from the tax note issued for the 2019 Bond Preliminary Engineering Reports/Design.

 

Recommendation

COMMITTEE RECOMMENDATION:

N/A

 

STAFF RECOMMENDATION:

Staff recommends approval a design contract for the Oak Run Sidewalk project as part of the proposed 2019 Bond Citywide Street and Sidewalks Program.