Title: Approval of a resolution to accept grant funds in the amount of $112,500 for the engineering/design, and $1,107,617 for the construction, of a regional detention pond, and general aviation apron/taxi lane pavement rehabilitation, from the Texas Department of Transportation - Aviation Division and authorizing the City Manager to accept funds and to execute all contract documents associated with the grant.
Attachments: 1. Resolution - TxDOT/Airport detention pond
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Presenter/Contact

Presenter

Robert Lee, Airport Director

Contact Info

(830) 221-4295 - Rlee@nbtexas.org

 

Subject Header

SUBJECT:

Title

Approval of a resolution to accept grant funds in the amount of $112,500 for the engineering/design, and $1,107,617 for the construction, of a regional detention pond, and general aviation apron/taxi lane pavement rehabilitation, from the Texas Department of Transportation - Aviation Division and authorizing the City Manager to accept funds and to execute all contract documents associated with the grant.

 

Body

BACKGROUND / RATIONALE:

The New Braunfels Regional Airport is currently eligible for Federal Non-Primary Entitlement Funds in the amount of $112,500 for certain improvements to the New Braunfels Regional Airport. This portion of the eligible project includes engineering and design for a new regional detention pond, and general aviation apron/taxi lane pavement rehabilitation. The New Braunfels Regional Airport will need to provide at least a 10% match of total the design cost which is estimated to be $125,000, therefore the required match would be $12,500.

 

Additionally, after the engineering/design phase, the City is eligible for $1,107,617 for the construction of the detention pond, including the installation of a storm sewer, general aviation apron/taxi lane rehabilitation, and miscellaneous costs such as the construction contingency and administration fees. The New Braunfels Regional Airport will need to provide at least a 10% match of total the construction cost which is estimated to be $1,230,685 therefore the required match would be $123,068.

 

While there are currently no funds programmed in the FY 2018-19 Adopted Budget to support this commitment; staff is confident that the $12,500 match (for design) can be absorbed in the current fiscal year Airport Fund Budget. The match for the construction ($123,068) will be incorporated into the FY 2019-20 Proposed Budget, when the project is anticipated to occur.

 

ADDRESSES A NEED/ISSUE IN A CITY PLAN OR COUNCIL PRIORITY:

X

Yes

City Plan/Council Priority:

3: Continue an ongoing program of infrastructure construction and maintenance

 

 

FISCAL IMPACT:

As mentioned above the total project requires a ten percent match, which will be supported by the Airport Fund in FY 2018-19 and FY 2019-20. At this time, a budget amendment is not necessary. However given that it is a reimbursement based grant, staff may bring a budget amendment back at a later date for City Council consideration. Therefore, sufficient funds are available to approve the resolution as described above.

 

Recommendation

COMMITTEE RECOMMENDATION:

N/A

 

STAFF RECOMMENDATION:

Staff recommends the approval of a resolution to accept grant funds in the amount of $112,500 for the engineering/design, and $1,107,617 for the construction, of a regional detention pond, and general aviation apron/taxi lane pavement rehabilitation, from the Texas Department of Transportation - Aviation Division and authorizing the City Manager to accept funds and to execute all contract documents associated with the grant.