New Braunfels Logo
File #: 19-502    Name:
Type: Recommendation Status: Individual Item Ready
File created: 6/26/2019 In control: Planning Commission
On agenda: 7/2/2019 Final action:
Title: Discuss and consider approval of the master plan for Highland Ridge Subdivision.
Attachments: 1. Aerial Map, 2. Reduced Master Plan (full size copy in packet)
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Presenter/Contact

Presenter

Applicant: HMT Surveying & Engineering; Case Manager: Matt Greene

Contact Info

(830) 221-4053 - mgreene@nbtexas.org

 

Subject Header

SUBJECT:

Title

Discuss and consider approval of the master plan for Highland Ridge Subdivision.

 

Body

BACKGROUND / RATIONALE:

Plat information:

Case #:                     MP19-0081

 

Owners:                     Schumacher Rentals, LLC                     Shumzipp, LLC

                     333 Schum Zipp Lane                                          333 Schum Zipp Lane

                     New Braunfels, TX 78130                     New Braunfels, TX 78130

 

Engineer:                     HMT Engineering & Surveying (Chris Crim, P.E.)

                     410 N. Seguin Ave.

                     New Braunfels, TX 78130

                     (830) 625-8555

 

Staff Contact:                     Matt Greene, Planner

                     (830) 221-4053, mgreene@nbtexas.org

 

Description:                     339 single-family residential lots on 58.62 acres

 

Background:

The subject property is located on West Zipp Road, south of the Legend Pond Subdivision, is comprised of 58.62 acres and is proposed for the development of 339 single-family residential lots and is zoned “ZH-A” Zero Lot Line Home District.

 

Drainage:

The City’s Engineering Division has reviewed preliminary project drainage as required by Section 118-51.e of the Platting Ordinance and in accordance with the requirements of the Platting Ordinance, Chapter 143 Municipal Drainage Utility Systems, and the Drainage and Erosion Control and Design Manual. Detailed review of project drainage will be completed with the submission and review of the construction plans prior to final plat submission.

 

No portion of the subject property is located within the 1% annual chance floodplain.

 

Utilities:

Water will be provided by Green Valley Special Utility District, wastewater will be provided by Guadalupe-Blanco River Authority and electric services will be provided by Guadalupe Valley Electric Cooperative.

 

Transportation:

Regional Transportation Plan

The proposed master plan is in compliance with the City’s Regional Transportation Plan.  There is a proposed 60-foot Collector located along the northwest boundary of the subdivision, the extension of Pahmeyer, a 60-foot Collector and Zipp Road to the north and east, a 60-foot Collector.  Right-of-way dedication will occur with the recordation of final plats.

 

Hike and Bike:

The proposed master plan is in compliance with the City’s Hike and Bike Trails Plan as there are no proposed trails within or adjacent to the property.

 

Sidewalks:

Four-foot wide residential sidewalks will be constructed by the developer as required along internal and adjacent external streets.

 

Roadway Impact Fees:

Roadway Impact Fees for Service Area 5 are hereby assessed with approval of the final plats.  Impact Fees are collected at time of building permit as indicated in the then current fee schedule for the intended use.

 

Parkland Dedication and Development:

This subdivision is subject to the 2018 Parkland Dedication and Development Ordinance.   It requires new residential projects to dedicate park land (or cash in-lieu-of) and pay a park development fee per dwelling unit.  According to the applicant’s park letter, this subdivision is intended to have private park land as required by the 2018 ordinance. Parks staff will review proposed improvements for compliance with code requirements.

 

STAFF RECOMMENDATION:

Staff recommends approval as it will meet all requirements of the Platting Ordinance and ZH-A development standards with the following:

1.                     TIA Report, Recommendation #4 - All-way stop shall be based on traffic volumes and not on sight distance. The road network shall be designed with all adequate sight distance requirements. A roundabout may be the appropriate at this location given the network. Remove “all way stop control” from Pg. 42 of TIA Report narrative. Revise report accordingly and submit to the City prior to submittal of any preliminary plats.

2.                     Note: Per Sec. 118-46 temporary turnarounds shall be required if the stub street is longer than the depth of one lot or 250 feet, whichever is less. Temporary turnaround shall be required for Street A.  This will need to be incorporated into the preliminary plat.

 

Attachments:

                     Aerial Map

                     Proposed Master Plan (full size plan provided in packet)